SENTALICA // Entity Performance Scorecard
Electricity Regulatory Authority
STATUS: Live Data
OVERALL PCI GRADE:A (84/100)
NATIONAL RANK:Top Sector Tier
CATEGORY:Utility/Agency
Core Performance Dashboard Metrics
Transparency Score
87/100[Excellent]
Average Procurement Cycle
47 Days[Med]
Contract Performance
84%[On-Time]
Average Payment Latency
39 Days[Optimal]
Average Bidders per Tender
4.2SME Scale
Appeals Rate
0.9%[Low]
1. Historical Winner ConcentrationTop 3: 61% Ratio
1.
Plumb Base Uganda6 active contracts
UGX 121B28% Share
2.
Stirling Civil Engineering2 active contracts
UGX 91B21% Share
3.
Prism Civil Works1 active contracts
UGX 52B12% Share
2. Top Disqualification Traps in this Agency
Missing NSSF Statutory Clearance CertificateIdentified Rejection Risk Pattern
42%Average Annual Construction Turnover DeficitIdentified Rejection Risk Pattern
28%Unsigned CV of Designated Key ExpertIdentified Rejection Risk Pattern
22%Active Auditor General (OAG) Warnings
OAG
[OAG-ERA-01] Delayed Micro-Dam Excavations
Overlapping environmental assessments delayed hydraulic site mobilization.
OAG
[OAG-ERA-02] Unfinished Vocational Block Abandonment
Procedural contractor defaults left three vocational workshops incomplete.