Sentalica
Back to PDE League Table
SENTALICA // Entity Performance Scorecard

Kasanda DLG New

STATUS: Live Data
OVERALL PCI GRADE:C (60/100)
NATIONAL RANK:Top Sector Tier
CATEGORY:Local Government
Core Performance Dashboard Metrics
Transparency Score
58/100[Excellent]
Average Procurement Cycle
65 Days[Slow]
Contract Performance
66%[On-Time]
Average Payment Latency
75 Days[Arrears Flag]
Average Bidders per Tender
6.7SME Scale
Appeals Rate
0.5%[Low]
1. Historical Winner ConcentrationTop 3: 63% Ratio
1.
CMD Civil Works5 active contracts
UGX 55B27% Share
2.
Excel Construction Ltd6 active contracts
UGX 40B20% Share
3.
Sogea Satom Uganda8 active contracts
UGX 32B16% Share
2. Top Disqualification Traps in this Agency
Insufficient Liquid Assets Bank ReferenceIdentified Rejection Risk Pattern
45%
Missing Local Content SME Partnership LetterIdentified Rejection Risk Pattern
31%
Non-compliance with Cold Chain Technical SpecsIdentified Rejection Risk Pattern
22%
Active Auditor General (OAG) Warnings
OAG
[OAG-KASAND-01] Material Price Indexation Adjustments

Significant variations due to fluctuating construction material price formulations.

OAG
[OAG-KASAND-02] Unaccounted Fuel Vouchers

Minor administrative mismatch identified in internal operations support logistics.

Fiduciary compliance screening platform  •  Sentalica 2026
Audit Draft Bid for this MDA