Sentalica
Back to PDE League Table
SENTALICA // Entity Performance Scorecard

Katakwi DLG

STATUS: Live Data
OVERALL PCI GRADE:B (72/100)
NATIONAL RANK:Top Sector Tier
CATEGORY:Local Government
Core Performance Dashboard Metrics
Transparency Score
78/100[Excellent]
Average Procurement Cycle
46 Days[Med]
Contract Performance
77%[On-Time]
Average Payment Latency
37 Days[Optimal]
Average Bidders per Tender
5.2SME Scale
Appeals Rate
0.7%[Low]
1. Historical Winner ConcentrationTop 3: 62% Ratio
1.
Ambitious Construction Co4 active contracts
UGX 325B26% Share
2.
Water Trust Ltd7 active contracts
UGX 237B19% Share
3.
CMD Civil Works4 active contracts
UGX 212B17% Share
2. Top Disqualification Traps in this Agency
Lacking High Voltage Line Construction ExperienceIdentified Rejection Risk Pattern
42%
Missing ISO Quality Management ProofsIdentified Rejection Risk Pattern
34%
Failure to provide structural concrete safety test logsIdentified Rejection Risk Pattern
20%
Active Auditor General (OAG) Warnings
OAG
[OAG-KATAKW-01] Material Price Indexation Adjustments

Significant variations due to fluctuating construction material price formulations.

Fiduciary compliance screening platform  •  Sentalica 2026
Audit Draft Bid for this MDA