SENTALICA // Entity Performance Scorecard
Lira University
STATUS: Live Data
OVERALL PCI GRADE:B (71/100)
NATIONAL RANK:Top Sector Tier
CATEGORY:Utility/Agency
Core Performance Dashboard Metrics
Transparency Score
71/100[Excellent]
Average Procurement Cycle
47 Days[Med]
Contract Performance
73%[On-Time]
Average Payment Latency
48 Days[Arrears Flag]
Average Bidders per Tender
5.2SME Scale
Appeals Rate
0.8%[Low]
1. Historical Winner ConcentrationTop 3: 52% Ratio
1.
Spencon Services1 active contracts
UGX 71B22% Share
2.
Acholiland Engineering Co4 active contracts
UGX 51B16% Share
3.
CMD Civil Works2 active contracts
UGX 45B14% Share
2. Top Disqualification Traps in this Agency
Inadequate Line of Credit Bank DocumentationIdentified Rejection Risk Pattern
43%Inadequate Physical School Construction ReferencesIdentified Rejection Risk Pattern
31%Non-compliance with Cold Chain Technical SpecsIdentified Rejection Risk Pattern
25%Active Auditor General (OAG) Warnings
OAG
[OAG-LU-01] Industrial Feeder Construction Delay Overruns
Swampy drainage specifications led to 90 days delay in aggregate roadbed compaction.
OAG
[OAG-LU-02] Procurement Plan Deviation
OAG noted significant deviations from approved annual procurement plans.
Fiduciary compliance screening platform • Sentalica 2026