Sentalica
Back to PDE League Table
SENTALICA // Entity Performance Scorecard

Ministry of Education & Sports (MoES)

STATUS: Live Data
OVERALL PCI GRADE:B (78/100)
NATIONAL RANK:Top Sector Tier
CATEGORY:Ministry
Core Performance Dashboard Metrics
Transparency Score
82/100[Excellent]
Average Procurement Cycle
50 Days[Med]
Contract Performance
85%[On-Time]
Average Payment Latency
52 Days[Arrears Flag]
Average Bidders per Tender
5.7SME Scale
Appeals Rate
0.7%[Low]
1. Historical Winner ConcentrationTop 3: 35% Ratio
1.
Excel Construction Ltd5 active contracts
UGX 100.8B14% Share
2.
Ambitious Construction Co4 active contracts
UGX 86.4B12% Share
3.
Pragmatic Builders7 active contracts
UGX 64.8B9% Share
2. Top Disqualification Traps in this Agency
Inadequate Physical School Construction ReferencesIdentified Rejection Risk Pattern
35%
Missing Joint Venture Power of AttorneyIdentified Rejection Risk Pattern
25%
Unsigned CV of Designated Site EngineersIdentified Rejection Risk Pattern
25%
Active Auditor General (OAG) Warnings
OAG
[OAG-MOES-01] Unfinished Vocational Block Abandonment

Procedural contractor defaults left three vocational workshops in East Uganda incomplete.

Fiduciary compliance screening platform  •  Sentalica 2026
Audit Draft Bid for this MDA