Core Performance Dashboard Metrics
Transparency Score
72/100[Excellent]
Average Procurement Cycle
56 Days[Med]
Contract Performance
67%[On-Time]
Average Payment Latency
51 Days[Arrears Flag]
Average Bidders per Tender
3.2SME Scale
Appeals Rate
0.6%[Low]
1. Historical Winner ConcentrationTop 3: 60% Ratio
1.
Source of the Nile Logistics3 active contracts
UGX 119B24% Share
2.
Stirling Civil Engineering8 active contracts
UGX 89B18% Share
3.
Western Earthworks Ltd8 active contracts
UGX 89B18% Share
2. Top Disqualification Traps in this Agency
Inadequate Hydraulic Pump Technical SpecificationsIdentified Rejection Risk Pattern
40%
Arithmetic Deviations over Statutory LimitIdentified Rejection Risk Pattern
31%
Omission of Regulatory NDA Product CertificatesIdentified Rejection Risk Pattern
16%
Active Auditor General (OAG) Warnings
OAG
[OAG-MKCCMA-01] Material Price Indexation Adjustments

Significant variations due to fluctuating construction material price formulations.