Sentalica
Back to PDE League Table
SENTALICA // Entity Performance Scorecard

Nwoya DLG

STATUS: Live Data
OVERALL PCI GRADE:D (59/100)
NATIONAL RANK:Top Sector Tier
CATEGORY:Local Government
Core Performance Dashboard Metrics
Transparency Score
52/100[Excellent]
Average Procurement Cycle
61 Days[Slow]
Contract Performance
65%[On-Time]
Average Payment Latency
72 Days[Arrears Flag]
Average Bidders per Tender
6.7SME Scale
Appeals Rate
0.7%[Low]
1. Historical Winner ConcentrationTop 3: 57% Ratio
1.
Excel Construction Ltd3 active contracts
UGX 119B23% Share
2.
Energoinvest DD6 active contracts
UGX 93B18% Share
3.
Victoria Builders5 active contracts
UGX 83B16% Share
2. Top Disqualification Traps in this Agency
Non-compliant System CertificationsIdentified Rejection Risk Pattern
47%
Incomplete municipal security guaranteesIdentified Rejection Risk Pattern
32%
Failed SCADA Grid Protocol System TestsIdentified Rejection Risk Pattern
22%
Active Auditor General (OAG) Warnings
OAG
[OAG-NWOYA--01] Industrial Feeder Construction Delay Overruns

Swampy drainage specifications led to 90 days delay in aggregate roadbed compaction.

OAG
[OAG-NWOYA--02] Feeder Road Heavy Erosion Washout

OAG flagged physical structural degradation on feeders completed less than 8 months prior.

Fiduciary compliance screening platform  •  Sentalica 2026
Audit Draft Bid for this MDA