SENTALICA // Entity Performance Scorecard
Office of the Prime Minister
STATUS: Live Data
OVERALL PCI GRADE:C (62/100)
NATIONAL RANK:Top Sector Tier
CATEGORY:Ministry
Core Performance Dashboard Metrics
Transparency Score
61/100[Excellent]
Average Procurement Cycle
67 Days[Slow]
Contract Performance
69%[On-Time]
Average Payment Latency
61 Days[Arrears Flag]
Average Bidders per Tender
4.7SME Scale
Appeals Rate
0.6%[Low]
1. Historical Winner ConcentrationTop 3: 55% Ratio
1.
Runyankole Services2 active contracts
UGX 96B21% Share
2.
Western Earthworks Ltd7 active contracts
UGX 78B17% Share
3.
Nile Civil Contractors4 active contracts
UGX 78B17% Share
2. Top Disqualification Traps in this Agency
Lacking High Voltage Line Construction ExperienceIdentified Rejection Risk Pattern
44%Failed SCADA Grid Protocol System TestsIdentified Rejection Risk Pattern
37%Inadequate manufacturer warranties for equipment fleetIdentified Rejection Risk Pattern
22%Active Auditor General (OAG) Warnings
OAG
[OAG-OPM-01] Industrial Feeder Construction Delay Overruns
Swampy drainage specifications led to 90 days delay in aggregate roadbed compaction.
OAG
[OAG-OPM-02] Substation Right-Of-Way Hostility
Social-environmental blockades delayed grid tie-in by 180 days.
Fiduciary compliance screening platform • Sentalica 2026