SENTALICA // Entity Performance Scorecard

Uganda Embassy in South Sudan, Juba Kololo Road, Tong Ping Area

STATUS: Live Data
OVERALL PCI GRADE:B (78/100)
NATIONAL RANK:Top Sector Tier
CATEGORY:Utility/Agency
Core Performance Dashboard Metrics
Transparency Score
82/100[Excellent]
Average Procurement Cycle
45 Days[Med]
Contract Performance
71%[On-Time]
Average Payment Latency
36 Days[Optimal]
Average Bidders per Tender
6.7SME Scale
Appeals Rate
0.6%[Low]
1. Historical Winner ConcentrationTop 3: 57% Ratio
1.
Nile Civil Contractors1 active contracts
UGX 108B27% Share
2.
Ankole Civil Contractors4 active contracts
UGX 64B16% Share
3.
Roko Construction3 active contracts
UGX 56B14% Share
2. Top Disqualification Traps in this Agency
Class 2 Statutory Substitution Errors (NSSF app instead of Certificate)Identified Rejection Risk Pattern
41%
Invalid Manufacturer Authorization FormIdentified Rejection Risk Pattern
37%
Inadequate manufacturer warranties for equipment fleetIdentified Rejection Risk Pattern
18%
Active Auditor General (OAG) Warnings
OAG
[OAG-UESS-01] Land Acquisition & Compensation Idle-Time Costs

Contract idle-time penalties caused by delayed right-of-way handovers costing treasury billions.