SENTALICA // Entity Performance Scorecard
Zombo
STATUS: Live Data
OVERALL PCI GRADE:C (65/100)
NATIONAL RANK:Top Sector Tier
CATEGORY:Local Government
Core Performance Dashboard Metrics
Transparency Score
71/100[Excellent]
Average Procurement Cycle
52 Days[Med]
Contract Performance
65%[On-Time]
Average Payment Latency
50 Days[Arrears Flag]
Average Bidders per Tender
4.2SME Scale
Appeals Rate
0.5%[Low]
1. Historical Winner ConcentrationTop 3: 57% Ratio
1.
Gulu Builders Joint Ventures5 active contracts
UGX 91B26% Share
2.
Busoga Engineering Ltd1 active contracts
UGX 70B20% Share
3.
Acholiland Engineering Co6 active contracts
UGX 39B11% Share
2. Top Disqualification Traps in this Agency
Lacking local equipment ownership certificationsIdentified Rejection Risk Pattern
47%Incorrect district local tax compliance logsIdentified Rejection Risk Pattern
37%Inadequate manufacturer warranties for equipment fleetIdentified Rejection Risk Pattern
22%Active Auditor General (OAG) Warnings
OAG
[OAG-ZOMB-01] Industrial Feeder Construction Delay Overruns
Swampy drainage specifications led to 90 days delay in aggregate roadbed compaction.
OAG
[OAG-ZOMB-02] Housing Estate Infrastructure Stalls
OAG audited variations in road reticulation subcontracting networks.
Fiduciary compliance screening platform • Sentalica 2026